Turnkey High-Rise Safety for New Tashkent Developments
Complete packages combining EN 12810 facade frames, crane-lifted EN 13374 perimeter edge barriers, and steel Z-staircase access towers.
Powering Central Asia’s fastest-growing construction market—supplying Turkish and Uzbek general contractors on New Tashkent high-rises, Samarkand hospitality developments, and Navoi mining/power plants with certified 24-ton truckload scaffolding.
Complete packages combining EN 12810 facade frames, crane-lifted EN 13374 perimeter edge barriers, and steel Z-staircase access towers.
Freestanding 8-way rosette scaffolding ideal for Samarkand architectural restoration as well as Navoi chemical, cement, and power plants.
Steel-strapped bundles, SM-F664 post pallets, and enclosed SM-A661 steel bins ensure zero transit loss across multi-border overland corridors.
Primary Ports & Industrial Hubs: Tashkent (New Tashkent), Samarkand, Bukhara, Navoi Mining & Fergana.
Extreme Continental Swing (-15°C to +45°C): Certified S235JR/S355JR structural steel tubing with hot-dip galvanizing built for decade-long multi-project reuse.
| Product Line | 40HC / 24t Truck Lot | Net Weight |
|---|---|---|
| H-Type Facade System | 1.450 – 1.650 m² | 24,0 – 25,5 t |
| Multidirectional Ringlock | 1.250 – 1.450 m² | 24,0 – 25,5 t |
| EN 13374 Edge Barriers | 1,200 – 1,600+ lin. m | 20,0 – 24,0 t |
| EN 74 Forged Couplers | 22,000+ pcs (SM-A661) | 24,5 – 25,5 t |
| EN 1004 Mobile Towers | 45 – 90 Complete Sets | 11,0 – 18,0 t |
Add any complete lot directly to your B2B quote cart in one click or request an itemized CIF / FOB / DAP proforma invoice tailored to Uzbekistan. All lots can also be quoted in Multidirectional Ringlock (SM-F).
1 × (25m × 20m) · 800 pcs
1 × (50m × 20m) · 1,553 pcs
2 × (37.5m × 20m) · 2,340 pcs
4 × (62.5m × 20m) · 7,735 pcs
Fits into upper trailer/container aisle space for indoor MEP & ceiling works.
40 mesh panels (250 cm) + 43 slab posts + anchors stacked in 2 SM-K667 pallets.
500 fixed + 250 swivel couplers sealed in a heavy steel crate—high density, minimal floor footprint.
TS EN 12810-1 / EN 12811-1
TS EN 12810-1 / EN 12811-1 / NF 096
TS EN 1004-1 Sertifikalı
TS EN 13374 Sınıf A
TS EN 74-1 Dövme & Pres Çelik (Ø48,3 mm)
Side-by-side EN norms, m² weights & 40HC capacities
Enter your building facade dimensions, EN 1004 mobile tower height, or slab perimeter to compute exact SM-series component quantities, net kg tonnage, and 40HC/FTL load ratios.
| Photo | SKU Code | Component Description | Dimensions | Qty | Unit Weight | Total Weight |
|---|---|---|---|---|---|---|
| SM-H101-075200 | H-Type Main Frame | 75x200 cm | 600 | 17.0 kg | 10,200.0 kg | |
| SM-H102-075110 | Top Level Half L Guardrail Frame | 75x110 cm | 50 | 5.5 kg | 275.0 kg | |
| SM-H158-048075 | Starting Base Member | 75 cm | 50 | 2.3 kg | 115.0 kg | |
| SM-H111-034250 | Horizontal Guardrail Brace | 250 cm | 1,200 | 3.8 kg | 4,560.0 kg | |
| SM-H121-042324 | Diagonal Brace | 324 cm | 144 | 7.6 kg | 1,094.4 kg | |
| SM-H139-030250 | Perforated Galvanized Steel Deck | 30x250 cm | 1,056 | 14.7 kg | 15,523.2 kg | |
| SM-H461-060250 | Aluminium Trapdoor Deck with Ladder | 60x250 cm | 48 | 22.5 kg | 1,080.0 kg | |
| SM-H151-015250 | Galvanized Steel Toe Board | 15x250 cm | 576 | 5.0 kg | 2,880.0 kg | |
| SM-H156-034075 | Side End Guardrail | 65 cm | 48 | 1.4 kg | 67.2 kg | |
| SM-H601-038070 | Base Adjustment Screw Jack | 70 cm | 100 | 3.4 kg | 340.0 kg | |
| SM-A631-048060 | Wall Tie Anchor Pipe | 60 cm | 180 | 2.3 kg | 414.0 kg | |
| SM-A641-048048 | Forged Fixed Right-Angle Coupler | Ø48x48 | 180 | 1.1 kg | 198.0 kg | |
| SM-A632-012021 | Eye Bolt + M12 Expansion Anchor | 21,5 cm / M12 | 180 | 0.3 kg | 54.0 kg |
8–12 Days to Aktau / Astana / Almaty
Engineered for Kazakhstan’s demanding climate and industrial standards—supplying EPC contractors in Atyrau/Tengiz oilfields a…
7–11 Days to Ashgabat / Arkadag
Purpose-built for monumental white-marble facade installations in Ashgabat and Arkadag Smart City as well as petrochemical/fe…
BOM & Tonnage
Designed with heavy-duty steel Z-staircase access for hospital complexes, mega residential developments, and multi-container …
TS EN 12810-1 / EN 12811-1
H-Type facade scaffolding is the fastest prefabricated frame scaffolding solution for high-rise residential towers, commercia…
Send your building dimensions or DWG drawings directly to co-founders İdris YAĞMAHAN (Architect), Celalettin YAĞMAHAN (Civil Engineer) & M. Furkan YAĞMAHAN (Interior Architect) for an itemized SM-series quotation.